钻井缩写大全
YUKI was compiled on the morning of December 16, 2020
1. OH open hole裸眼
2. FH full hole 满眼,贯眼 at full speed
3. AD assistant driller 副司钻
4. NTP (N toolpusher)night toolpusher夜班队长5. RM reaming 划眼 rig manager 平台经理
6. Back RM back ream倒划眼
7. CSG casing 套管
8. TBG tubing 油管 coiled tubing
9. REG regular 常规扣 at regular intervals meeting
10. FTG footage 进尺
11. FPH footage per hour 每小时进尺
12. SNG single 单根
13. Hrs. hours
14. Yest. Yesterday
15. Fin. Finish 完成
regular meeting,
irregular 16. OBS observe 观察
17. w/, t/, F/ with, to, from
18. XO crossover joint/sub 配合接头
19. BOP blowout preventer 防喷器
20. IBOP inner BOP 内防喷器
21. TDS Top drive system 顶驱
22. TOF top of fish 鱼顶
23. HHP hydraulic horse power 水马力
24. Hi-vis high viscosity 高粘
25. RPM revolution per minute 转速
26. SPM strokes per minute泵冲数 stroke length
27. ROP rate of penetration 机械钻速
28. CCTV closed-circuit television
29. MWD measuring while drilling 随钻测量
30. DP drill pipe 钻杆
31. HWDP heavy wall/weight drill pipe 加重钻杆
32. DC drill collar 钻铤
33. NMDC non-magnetic drill collar 无磁钻铤
34. STB stabilizer 扶正器
35. JNT joint 单根
36. IF internal flush 内平扣
Internal-external inner-outer inside-outside
Input-output entrance-exit inlet-outlet
Indoors-outdoors
Increase- decrease raise-lower upper-lower
37. IU internal upset 内加厚
38. EU external upset 外加厚
39. IEU internal & external upset 内外加厚
40. WOB weight on bit 钻压 bit load
41. ECD equivalent circulating density 当量循环密度
42. BHA bottom hole assembly 底部钻井组合
43. DST drill stem test中途测试
44. KOP kick off point 造斜点
45. KS keyseat 键槽
46. STDS stands 立柱
47. VIS viscosity 粘度
48. WL water loss 失水 wireline电线
49. PV plastic viscosity 塑粘
50. FL filtrate loss 滤失
51. TD total depth 总井深
52. TVD true vertical depth 垂深
53. MD measured depth测深
54. DIR direction 定向
55. DD directional driller 定向井司钻
56. DDR daily drilling report 钻井日报
57. AZM(AZI) azimuth 方位角
58. DEV deviation 井斜
59. INC. inclination井斜 incomplete 未完成
60. ID inside diameter 内径
61. OD outside diameter 外径
62. PPG pound per gallon 磅每加仑
63. LCM lost circulation material 堵漏材料
64. P/N part number 零件号
65. S/N serial number 序列号
66. N/W net weight 净重
67. G/W gross weight 毛重
68. P/t pressure test 试压
69. P/u pick up 上扣
70. M/u make up 上扣
71. B/o back off 卸扣
72. L/d lay down 甩单根
73. N/u nipple up 安装(防喷器,采油树)
74. N/d nipple down 拆卸(防喷器,采油树)
75. R/u rig up安装
76. R/d rig down 拆卸
77. WOC wait on cement 候凝
78. RIH run in hole 下钻
79. POOH pull out of hole 起钻
80. DRG drilling 钻进
81. WOW wait on water 等水
82. SX sacks 袋
83. MW mud weight 泥浆比重
84. CBU circulation bottom up 底部循环一周
85. YP yield point 屈服值,动切力
86. NP neutral point 中和点
87. Gel 静切力
88. HTHP high temperature high pressure 高温高压
89. PPE personal protective equipment 劳保
90. PDM positive displacement motor 螺杆,容积式马达
91. TFA total flow area 总流量面积
92. BHP bottom hole pressure 井底压力
93. MAASP maximum allowable annulus safety pressure 最大允许环空压力
94. SIDPP shut-in drill pipe pressure 关井立压
95. SICP shut-in casing pipe 关井套压
96. SPP standpipe pressure 立管压力
97. HP high pressure 高压 hydrostatic pressure 静液柱压力98. DLS dog leg severity 狗腿严重度 severe
99. LOT leak off test 漏失试验
100. LTI lost time injured 工伤损耗
101. LTA last time accident 上一次事故
102. HCR hydraulic control remote 远程液控
103. FIT formation integrity test 地破压力测试
104. NDT non-destruction test 无损探伤
105. LPR lower pipe ram 下半封闸板
106. UPR upper pipe ram 上半封闸板
107. MUT make up torque 上扣扭矩
马力 horsepower
108. RKB rotary kelly bushing 磙子方补心
109. RPSP reduced pump stroke pressure 低泵速压力
110. Shut-in wellhead & shut in pressure 关井压力
111. SSSV sub-surface safety valve 井下安全阀
112. SPP standpipe pressure 立柱压力
113. CP casing pressure 套压 conduct pipe 导管
114. WC water content 含水 water cut 水侵
115. LP low pressure 低压
116. WOO wait on order 待命
117. LWD logging while drilling 随钻测井
118. PTW permit to work 工作许可
119. BPV back pressure valve 回压凡尔
120. NP non-programmed 设计外的,计划外的
121. BHT bottom hole temperature 井底温度
122. PF 摩擦系数
123. DSA double studded adapter 双栽丝法兰,双螺栓法兰
124. ICP initial circulating pressure 初始循环压力
125. BUR build up rate 造斜率
126. RMR reamer 划眼器
127. PIC person in charge 负责人
128. PJSM pre-job safety meeting 工作前安全会
129. STK stroke 冲数
130. RH rat hole 大鼠洞
131. BTC buttress thread connection 梯型扣
132. LTC long thread connection 长圆扣
133. STC short thread connection 短圆扣
134. CHC circulate hole clean 循环清洗井底
135. TOC top of cement 水泥返高
136. PBTD plug back total depth 人工井底
137. WBM water-based mud 水基泥浆
138. OBM oil-based mud 油基泥浆
139. LO/TO lock-out/tag-out 锁定牌(维修中)
140. SABA supplied air breathing apparatus 空气呼吸器
141. MSDS material safety data sheet 材料安全数据表
142. MPI magnetic particle inspection 磁粉探伤
143. ESP electric submersible pump 电潜泵
144. TCA tubing and casing annulus 油套环空
145. CCA casing and casing annulus 套管与套管环空
146. NBS near-bit stabilizer 近钻头扶正器
147. P&A plug and abandon 填井,弃井
148. JSA job safety analysis 工作安全分析
149. SO slack off 下放遇阻
150. SWL safety working load 安全工作负荷
151. N/A non-applicable 不适用的
152. Torq. torque 扭矩
153. bbl barrel 桶
154. F/C float collar 浮箍
155. F/v float valve 浮阀
156. F/S float shoe 浮鞋
157. CMT cement 固井
158. WT weight 重量
159. BPH barrel per hour 桶每小时
160. PG pressure gradient 压力梯度
161. BU balled up 泥包
162. QHSE quality health safety evironment
163. CWP cold work permit 冷作业许可
164. HWP hot work permit 热作业许可
165. EWP electric work permit 电作业许可
166. SD shut down 关闭 sand 含砂
167. JB junk basket 打捞杯
168. EST estimate 评估
169. CUM cumulated 累积的
170. SS shock sub 减震器
171. NPC non-magnetic pony collar 无磁短钻铤
172. ASSY assembly 总成
173. CONN connect 连接
174. BTM bottom 底部
175. PKR 封隔器
176. RSS rotary steerable system 旋转导向系统
177. SOW slip on weld 卡瓦焊接式(套管头)
178. LITH lithology 岩性
因篇幅问题不能全部显示,请点此查看更多更全内容