发布网友 发布时间:2022-04-24 06:00
共2个回答
热心网友 时间:2023-10-05 11:09
Mainly responsible for the consumption of tap water engineering and drainage engineering project of ventilation and air conditioning engineering heat transfer station and heating engineering
还有:
Mainly be responsible for the consumption of tap water engineering drainage engineering Ventilation and air conditioning engineering heating of the heat exchange station and work
如有疑问请继续追问,望采纳,谢谢,您的采纳是我的力量!
热心网友 时间:2023-10-05 11:10
'Is mainly responsible for the consumption of tap water engineering and drainage engineering project of ventilation and air conditioning engineering heat transfer station and heating engineering gas engineering project management'追答满意请采纳!